Skip to main content
Steel pipe rack and process structures at an onshore plant

GCC & MENA

Steel Detailing for GCC & Middle East Projects

Tekla models, fabrication drawings and reinforcement documentation for oil, gas, petrochemical and industrial projects across the Gulf, from a senior team whose experience was built on the region's energy facilities.

One Team for the Region's Energy Projects

PetroHill provides structural steel detailing, Tekla modelling, RCC and rebar documentation and brownfield modification drawings for fabricators and EPC contractors working across the Gulf Cooperation Council and the wider Middle East. From Lahore we are one to two hours ahead of every Gulf capital, so our working day covers yours from the first call to the last transmittal.

The region is where our senior team's experience was formed. In prior roles they worked on the Hail & Ghasha onshore facilities, the Umm Lulu offshore development and BAB and ASAB modifications in Abu Dhabi, the Hawiyah NGL Recovery Project in Saudi Arabia, the Dolphin Energy gas project linking Qatar and the UAE, and the Diwaniya refinery expansion in Iraq. That range covers greenfield and brownfield, onshore and offshore, steel and concrete.

Gulf projects share a pattern: operator standards sit above the international codes, specifications are long, and fabricators are inspected against all of them. ADNOC-group projects refer to AGES and project specifications, Saudi Aramco projects to SAES and SAMSS, and QatarEnergy and Kuwait Oil Company projects to their own engineering standards. We detail to the documents issued with each package, record which one governs each requirement and raise conflicts as formal queries. We do not claim approval or registration with any operator.

Each country has its own page with the packages, specifications and questions that matter there. If your project sits elsewhere in the region, such as Kuwait, Oman, Bahrain or Iraq, the same scope review applies: we confirm the governing documents, drawing standard, numbering and issue dates before modelling begins.

Scope & Deliverables

Typical regional packages

  • Pipe Racks and Pipe Bridges for Process and Utility Areas
  • Platforms, Stairs, Ladders and Access Steel Around Equipment
  • Equipment Supports, Skids, Shelters and Compressor Houses
  • Offshore Topsides Secondary Steel and Modification Steel
  • Foundations, Pedestals and Rebar Placing Drawings with BBS
  • Brownfield Tie-Ins and As-Built Records from Verified Survey Data

Deliverables

  • Tekla Structures Detailing Model
  • GA, Erection, Assembly and Single-Part Drawings
  • Anchor Bolt Plans and Embed Details
  • Bar Bending Schedules to BS 8666 or the Specified Convention
  • MTO, Bolt Lists, Drawing Registers and Transmittals
  • NC / DSTV Files and IFC Exports Where Contracted

Standards & Specifications

Operator standards (ADNOC AGES, Saudi Aramco SAES and SAMSS, QatarEnergy and KOC standards) and the project specification govern where they apply, with AISC, Eurocode or ACI design bases as your engineer specifies. We detail to them as issued. Working to a standard is not a claim of approval or certification.

The scope of work records the applicable standards and editions for each package. A reference to a standard does not imply design verification or certification.

How standards are applied
  • Client / EPC / asset owner

    Project specifications

    Client, EPC and Owner Standards and Project Specifications

  • AISC

    AISC 303

    Code of Standard Practice for Steel Buildings and Bridges

  • AISC

    AISC 360

    Specification for Structural Steel Buildings

  • CEN

    Eurocodes

    Eurocodes with the Applicable National Annex

  • ACI

    ACI 318

    Building Code Requirements for Structural Concrete

  • BSI

    BS 8666

    Scheduling, Dimensioning, Cutting and Bending of Steel Reinforcement

  • AWS

    AWS D1.1

    Structural Welding Code — Steel

  • ISO

    ISO 19902

    Fixed Steel Offshore Structures

From Lahore, on your schedule

Working Your Hours

Lahore is UTC+5: one hour ahead of the UAE and two ahead of Saudi Arabia and Qatar, so we work your full business day.

  • UTC+5LahoreOur office (no daylight saving)
  • UTC+4UAE1 hour behind Lahore
  • UTC+3Saudi Arabia2 hours behind Lahore
  • UTC+3Qatar2 hours behind Lahore

How a Package Runs

Inputs, model, checks, drawings and revisions, with information gaps raised before work proceeds.

  1. 01

    Inputs

    Design, operator standards, project specifications and vendor data reviewed; the governing hierarchy recorded.

  2. 02

    Model

    Tekla model or RCC drawings set up to the project numbering, phasing and drawing standard.

  3. 03

    Checks

    Model and drawings checked against the design, the specifications and the query log.

  4. 04

    Drawings

    Fabrication, erection and reinforcement documents issued through your document control.

  5. 05

    Revisions

    Client and inspection comments clouded, re-issued and tracked to closure in the register.

Which countries in the Middle East do you support?

We have dedicated pages for the UAE, Saudi Arabia and Qatar, and we take packages for Kuwait, Oman, Bahrain and Iraq on the same basis. The country matters less than the governing documents: we confirm the operator standards and project specification for each package before modelling begins.

Are you an approved vendor with ADNOC, Saudi Aramco or QatarEnergy?

No, and we do not claim to be. Our senior team worked on projects for these operators in prior roles, and we detail to the standards and specifications issued with each package. Vendor approval and qualification sit with the EPC contractor and the fabricator.

How do you handle the Gulf working week and Ramadan hours?

Lahore is one to two hours ahead of the Gulf, so our day covers yours. Issues and progress meetings are planned around your working week, and during Ramadan we agree adjusted call times and issue dates at the start of the month rather than assume them.

How quickly will we receive a quote?

We reply to quote requests within 24 hours (GCC working day). Send drawings or a scope summary with the deliverables, standards and target dates you have; where inputs are incomplete we list the assumptions we priced and the questions to close.

Can we start with a small trial package?

Yes. Our pilot is one assembly or a 5–10 t package, at a fixed price, delivered in 5 working days from receipt of complete inputs. It lets you check our model, drawing standard and checking on your own project before committing a larger package. NDA on request.

Send Your Drawings

We reply within 24 hours (GCC working day). A scope summary is enough to start; NDA on request.

Technical services involvedOptional, tick any that apply

Describe the structures, the design inputs you have, the deliverables you need and your target schedule.

Technical details (optional)

For example Tekla Structures 2024, AutoCAD, native or IFC exchange.

For example 40 shop drawings or BBS for 12 foundations, plus the codes and standards that apply.

One file up to 8 MB (.pdf, .dwg, .dxf, .zip, .png, .jpg, .jpeg). Please do not attach confidential drawings here; project files are exchanged after first contact, under an NDA if required.

Only name, organisation, work email, service and scope summary are required. Your details are used to respond to this enquiry and prepare any quotation; see our Privacy Policy. Please do not send confidential drawings until an NDA or approved file exchange is agreed.

For Clients Only

Our project drawings are confidential. Full views, downloads and copies are available to clients only. Contact us to discuss samples relevant to your scope.

Contact Us