Skip to main content
Engineering drawings on a desk with drafting pencils and a scale rule

Technical Capabilities

Project-Specific Engineering Standards & Technical Requirements

How the requirements that govern each package are identified, applied and checked, and who is responsible for what.

Working Within Your Project's Engineering Standards

Projects apply different design codes, material and welding specifications, reinforcement detailing requirements, owner standards, EPC procedures and drawing conventions. We approach each package by identifying the requirements that apply to it, not by limiting work to a fixed list of published codes.

At the start of an assignment, the client-supplied design basis, project specifications, applicable editions, documentation procedures and interface requirements are reviewed for relevance to the drawings, models and schedules being produced. Technical queries are raised where source information or responsibilities are unclear. Where design calculations, independent engineering verification or professional approval are needed, those remain separately defined activities undertaken only by appropriately authorised personnel.

Standards Organised by Requirement

The families of requirements a project typically defines, and what the team reviews for its assigned scope.

  • Structural Design Basis

    Typical project documents

    Approved calculations and drawings, design criteria, design codes and the connection basis.

    What we review

    References to the approved engineering information; design authority and changes remain as defined.

  • Structural Fabrication and Erection

    Typical project documents

    Steelwork tolerances, shop practice, welding and bolting specifications and part marking.

    What we review

    Details and schedules consistent with the supplied requirements.

  • Concrete and Reinforcement

    Typical project documents

    Approved concrete design, cover, lap and bar details, and bending and scheduling rules.

    What we review

    Concrete detail drawings and BBS in the project-required conventions.

  • Offshore and Plant Technical Standards

    Typical project documents

    Owner- and asset-specific structural, material, interface and documentation requirements.

    What we review

    Scope-specific drawing and model constraints and interface references.

  • Information and Document Management

    Typical project documents

    Drawing numbering, title blocks, model exchange, file naming, reviews and issue status.

    What we review

    Registers, file outputs, model coordinates and revision and transmittal format.

  • Quality and Approval Procedures

    Typical project documents

    Document checking, review hold points, RFIs and technical queries, and approvals.

    What we review

    Internal production-review obligations and the named final approval authority.

Project specifications may reference AISC, ACI, AWS, ISO, British Standards, Eurocodes and asset-owner or EPC standards, among other applicable frameworks. This list is illustrative, not exhaustive; applicability and the required edition are defined by each project.

Show example references and how they are used
  • Client / EPC / asset owner

    Project specifications

    Client, EPC and Owner Standards and Project Specifications

    Drafting and modelling standards, title blocks, numbering, material specifications and file formats for the specific project.

    Responsibility
    Client / project engineering team
    Relevant services
    All services

    Usually override or supplement general standards within the contract hierarchy agreed for the project.

  • AISC

    AISC 303

    Code of Standard Practice for Steel Buildings and Bridges

    Publisher(opens in a new tab)

    Structural steel detailing, fabrication and erection practice, including the exchange of design and detailing information.

    Responsibility
    Contract parties as defined in the project; design by the engineer of record

    Working to AISC 303 does not imply AISC certification.

  • AISC

    AISC 360

    Specification for Structural Steel Buildings

    Steel design framework referenced by the responsible designer; relevant to how design information is presented on drawings.

    Responsibility
    Responsible structural designer

    Design requirements are set by a qualified design authority; detailing does not perform or approve design.

  • AWS

    AWS D1.1

    Structural Welding Code — Steel

    Publisher(opens in a new tab)

    Weld symbols and weld-related information shown on steel shop drawings, as specified by the design.

    Responsibility
    Responsible designer and fabricator

    Weld notation on drawings is not a welding service or welding certification.

  • RCSC

    RCSC Specification

    Specification for Structural Joints Using High-Strength Bolts

    Bolt types, joint designations and bolt lists on steel connection details.

    Responsibility
    Responsible designer

    Followed as specified in the approved design and contract edition.

  • ACI

    ACI 318

    Building Code Requirements for Structural Concrete

    Concrete design framework referenced by the responsible designer; governs cover, laps and anchorage shown on detailing.

    Responsibility
    Responsible structural designer

    Reinforcement is detailed from approved design requirements; detailing is not concrete design approval.

  • ACI

    ACI 315 family

    Guidance on Detailing Concrete Reinforcement

    Presentation of reinforcement drawings, bar marks and placing information.

    Responsibility
    Detailer, to the project-specified reference

    Applicable document and edition confirmed per project.

  • BSI

    BS 8666

    Scheduling, Dimensioning, Cutting and Bending of Steel Reinforcement

    Bar shape codes and bar bending schedules where the contract specifies British practice.

    Responsibility
    Detailer, to the project-specified edition

    Exact edition and adoption confirmed for each project.

  • CEN

    Eurocodes

    Eurocodes with the Applicable National Annex

    Steel and concrete design basis on projects that adopt European standards.

    Responsibility
    Responsible structural designer

    Not mixed with incompatible design bases; the project design basis governs.

  • CEN / BSI

    EN 1090-2 (BS EN 1090-2 in the UK)

    Execution of Steel Structures: Technical Requirements

    Fabrication and erection requirements by execution class (EXC1 to EXC4), which the designer states in the execution specification.

    Responsibility
    Designer (execution class and specification); fabricator (execution and CE/UKCA marking)

    The detailer works to the stated execution class; it does not select it or certify conformity.

  • BCSA

    NSSS

    National Structural Steelwork Specification for Building Construction

    UK building steelwork specification commonly adopted as the execution specification alongside BS EN 1090-2.

    Responsibility
    Specifier and steelwork contractor, as set in the contract

    Applies only where the contract adopts it; edition confirmed per project.

  • Standards Norway

    NORSOK M-101

    Structural Steel Fabrication

    Fabrication requirements on North Sea offshore and some onshore energy projects where the operator specifies NORSOK.

    Responsibility
    Fabricator and responsible offshore structural designer

    Relevant only where the operator or contract specifies it.

  • Standards Australia

    AS 4100

    Steel Structures

    Steel design basis on Australian projects; member sizes and connection requirements come from the designer working to it.

    Responsibility
    Responsible structural designer

    Design to AS 4100 stays with the designer; detailing presents the approved design.

  • Standards Australia / Standards New Zealand

    AS/NZS 5131

    Structural Steelwork: Fabrication and Erection

    Fabrication and erection requirements by construction category (CC1 to CC4), stated by the designer.

    Responsibility
    Designer (construction category); fabricator and erector (compliance)

    The detailer works to the stated construction category; it does not select it or certify compliance.

  • Standards Australia

    AS 3600

    Concrete Structures

    Concrete design basis on Australian projects, including the cover and reinforcement requirements shown on placing drawings.

    Responsibility
    Responsible structural designer

    Reinforcement design stays with the designer; detailing presents it buildably.

  • ISO

    ISO 19902

    Fixed Steel Offshore Structures

    Offshore structural packages where the contract designates this standard.

    Responsibility
    Responsible offshore structural designer

    Relevant only where the contract applies it; no offshore structural analysis is implied.

  • ISO

    ISO 19901-3

    Topsides Structure

    Offshore topsides structural requirements where specified.

    Responsibility
    Responsible offshore structural designer

    Exact contract edition and discipline scope confirmed per project.

  • ISO

    ISO 19650 series

    Information Management Using Building Information Modelling

    Model information exchange and naming where a project adopts it.

    Responsibility
    Project information manager / client

    Working within an ISO 19650 process does not confer BIM certification.

  • ISO

    ISO 9001

    Quality Management Systems

    Organisational quality-management framework some clients reference in their supplier requirements.

    Responsibility
    Certifying body (where a certificate is held)
    Relevant services
    Organisational only

    PetroHill does not claim ISO 9001 certification.

Practical Technical Requirements Workflow

Requirements are only useful if their applicability is clear. We identify the codes and specifications relevant to the assigned deliverables, confirm conventions and responsibility limits, capture technical queries and submit revision-controlled outputs for the agreed client review. A drawing check is never a substitute for engineering analysis or statutory certification.

  1. 01

    Scope and Inputs

    Client scope and approved engineering inputs received.

  2. 02

    Identify Requirements

    Applicable standards, editions and client specifications identified.

  3. 03

    Rules and Responsibilities

    Drawing and model rules, interfaces and responsibility matrix defined.

  4. 04

    Clarifications

    Unclear inputs recorded and technical clarifications obtained.

  5. 05

    Production

    Agreed drawings, models and schedules produced.

  6. 06

    Checks and Review

    Scope-based checks; authorised comments loop back to clarification.

  7. 07

    Handover

    Accepted as contracted; final agreed handover.

Responsibility Matrix

Typical responsibilities, always subject to the project contract.

Typical responsibilities for drafting, detailing and modelling packages
ActivityTypical responsibility
Design basis, structural calculations and member sizingClient's engineer or appointed design authority, unless a qualified design scope is separately assigned
Approved connection design or delegated connection engineeringResponsible engineer or a contractually appointed qualified designer
Drafting, detailing and model productionPetroHill, within the agreed production scope
Project-specific drawing and model consistency checksAssigned production checker under the agreed procedure
Technical queries and resolution of missing dataClarified by the named engineering or client authorities
Client review, acceptance and statutory approvalAssigned client, engineer or authority according to the project contract
Final record and as-built verificationResponsible field, survey or construction authority supplying verified records; PetroHill documents the agreed updates

Agreed for Each Package

The information typically agreed with the client before production starts, so both teams work to the same basis. The exact record is defined in the scope of work.

Quality & Delivery
  • Scope and Discipline
  • Applicable Standards and Specifications
  • Edition Specified by the Contract
  • Client-Specific Departures
  • Reference Drawing and Specification Revisions
  • Who Supplies and Approves the Design
  • Checker Responsibility
  • Clarifications and the Agreed Document Hierarchy

Common Questions

How project standards, codes and approvals relate to drafting, modelling and detailing work.

Can you work to our company standards instead of a particular international code?

The applicable client and owner engineering standards, project specifications, drawing procedures and approved design criteria are evaluated at scope review. We confirm whether current personnel and software can meet the requested package before accepting it.

Are you restricted to the codes mentioned on this website?

No. No exhaustive list is intended. Applicability and deliverable responsibilities are determined by the contract and confirmed during review.

Does a code-based drawing mean you certify the structural design?

No. A drawing or model prepared to approved project documentation requirements is distinct from independently checking or approving calculations and structural adequacy.

How are conflicts between owner specifications and published codes handled?

The conflict is recorded as a technical query and an authorised project decision is obtained. We do not impose a universal hierarchy; contractual documents and the applicable law control it.

Process towers and a crane under an evening sky

Working to a specificcode or client specification?

Tell us which standards, specifications and editions apply to your package. Applicability and responsibilities are confirmed in the scope of work before production starts.

For Clients Only

Our project drawings are confidential. Full views, downloads and copies are available to clients only. Contact us to discuss samples relevant to your scope.

Contact Us