Skip to main content
Dense network of industrial pipes and valves

EN 1090 · Eurocodes · NORSOK

Steel Detailing Services for European Projects

Tekla models and fabrication drawings for European industrial, energy and offshore steelwork, prepared to your execution specification, three to four hours ahead of Central European time.

Detailing to European Execution Specifications

PetroHill provides Tekla detailing capacity to steel fabricators, detailing offices and EPC contractors across Europe working on industrial, energy and offshore projects. From Lahore we are three to four hours ahead of Central European time: your morning overlaps our afternoon for calls and queries, and comments sent in your afternoon are picked up at the start of our next day.

European steelwork follows a common framework with national detail. Design is to the Eurocodes with the National Annex of the country where the structure is built, and execution to EN 1090-2 at the execution class the designer specifies, with the fabricator responsible for CE marking under EN 1090-1. On North Sea offshore and some onshore energy work, the operator may add NORSOK requirements such as M-101 for structural steel fabrication. We confirm which documents apply, in what order, before any modelling starts.

Our senior team's background is heavy industrial and energy steel: refinery expansions, gas-processing units, offshore topsides and brownfield modifications, mainly in the Middle East and Central Asia. For European packages we pair that experience with a scope review of your drawing standard, marking system, language requirements for drawing text and shop conventions, and we offer a fixed-price pilot so you can check our output on your own project.

We work in English. Where drawings must carry another language, we agree the title block, standard notes and terminology list with you at the start so that every sheet is consistent.

Scope & Deliverables

Typical European packages

  • Process, Chemical and Energy Plant Structures
  • Pipe Racks, Platforms and Access Steel
  • Offshore Topsides Secondary Steel and Modules Where Specified
  • Equipment Supports and Skid Frames
  • Modification Steel for Operating Sites
  • Rebar Placing Drawings and Bar Schedules

Deliverables

  • Tekla Structures Detailing Model
  • GA, Erection, Assembly and Single-Part Drawings
  • Anchor and Embed Plans
  • Member, Bolt and Material Lists
  • IFC Exports for Coordination with Plant Design Tools
  • NC / DSTV Files Where Contracted

Standards & Specifications

The execution class, execution specification and any operator requirements come from the designer and the contract; we detail to them and do not select the class or certify conformity. CE marking under EN 1090-1 is the fabricator's. Working to a standard is not a claim of certification.

The scope of work records the applicable standards and editions for each package. A reference to a standard does not imply design verification or certification.

How standards are applied
  • CEN

    Eurocodes

    Eurocodes with the Applicable National Annex

  • CEN / BSI

    EN 1090-2 (BS EN 1090-2 in the UK)

    Execution of Steel Structures: Technical Requirements

  • Standards Norway

    NORSOK M-101

    Structural Steel Fabrication

  • Client / EPC / asset owner

    Project specifications

    Client, EPC and Owner Standards and Project Specifications

  • ISO

    ISO 19650 series

    Information Management Using Building Information Modelling

  • ISO

    ISO 19902

    Fixed Steel Offshore Structures

From Lahore, on your schedule

Working Your Hours

Central Europe is three to four hours behind Lahore. Your morning overlaps our afternoon for calls and queries, and comments sent in your afternoon are picked up at the start of our next day.

  • UTC+5LahoreOur office (no daylight saving)
  • UTC+1 / +2Central Europe3–4 hours behind Lahore
  • UTC+0 / +1UK & Portugal4–5 hours behind Lahore
  • UTC+2 / +3Eastern Europe2–3 hours behind Lahore

How a Package Runs

Inputs, model, checks, drawings and revisions, with information gaps raised before work proceeds.

  1. 01

    Inputs

    Design, National Annex, execution specification and class, operator requirements and drawing standard confirmed.

  2. 02

    Model

    Tekla model built to your numbering, phasing and assembly rules.

  3. 03

    Checks

    Model and drawings checked against the design, the execution specification and the query log.

  4. 04

    Drawings

    Fabrication and erection documents issued in the agreed language and format.

  5. 05

    Revisions

    Comments and design changes clouded, re-issued and tracked in the revision register.

Who decides the EN 1090 execution class?

The designer, in the execution specification. EN 1090-2 sets four execution classes, EXC1 to EXC4, with stricter requirements as the class rises. We detail to the class stated and make sure the drawings carry the information it requires; we do not choose the class.

Can you work to NORSOK requirements on offshore packages?

Yes, where the operator specifies them. We detail to NORSOK M-101 and the project's own offshore specifications as issued, with weld and inspection categories taken from the design. Offshore structural design and analysis stay with the responsible engineer.

Can drawings be issued in languages other than English?

We work in English. Where your project needs another language on drawings, we agree the title block, standard notes and a terminology list at the start, so that every sheet uses the same approved wording.

How quickly will we receive a quote?

We reply to quote requests within 24 hours (GCC working day). Send drawings or a scope summary with the deliverables, standards and target dates you have; where inputs are incomplete we list the assumptions we priced and the questions to close.

Can we start with a small trial package?

Yes. Our pilot is one assembly or a 5–10 t package, at a fixed price, delivered in 5 working days from receipt of complete inputs. It lets you check our model, drawing standard and checking on your own project before committing a larger package. NDA on request.

Send Your Drawings

We reply within 24 hours (GCC working day). A scope summary is enough to start; NDA on request.

Technical services involvedOptional, tick any that apply

Describe the structures, the design inputs you have, the deliverables you need and your target schedule.

Technical details (optional)

For example Tekla Structures 2024, AutoCAD, native or IFC exchange.

For example 40 shop drawings or BBS for 12 foundations, plus the codes and standards that apply.

One file up to 8 MB (.pdf, .dwg, .dxf, .zip, .png, .jpg, .jpeg). Please do not attach confidential drawings here; project files are exchanged after first contact, under an NDA if required.

Only name, organisation, work email, service and scope summary are required. Your details are used to respond to this enquiry and prepare any quotation; see our Privacy Policy. Please do not send confidential drawings until an NDA or approved file exchange is agreed.

For Clients Only

Our project drawings are confidential. Full views, downloads and copies are available to clients only. Contact us to discuss samples relevant to your scope.

Contact Us