Steel Detailing for Qatar Gas & Industrial Projects

Tekla models, fabrication drawings and material take-offs for Qatar's gas, LNG and industrial steelwork, from a senior team with Dolphin Energy project experience, two hours ahead of Qatar time.

Detailing Support for Qatar's Gas Sector

PetroHill supports fabricators and EPC contractors delivering steel and concrete structures for Qatar's gas, LNG, petrochemical and industrial projects. We work from Lahore, two hours ahead of Arabia Standard Time, so our working day covers the whole Qatar business day.

Qatar's energy work is concentrated in a few large industrial cities, Ras Laffan and Mesaieed above all, where expansion trains, utilities and brownfield tie-ins generate large volumes of pipe rack, platform, shelter and equipment-support steel. Fabricators in Doha's industrial areas and the yards serving these sites need detailing capacity that can follow a long, specification-driven document hierarchy without slowing down.

Our senior team's Qatar experience comes from the Dolphin Energy project, which processes Qatari gas for export to the UAE. In prior engagements they produced detailed engineering drawings, PDS and FrameWorks Plus models, model reviews and material take-offs. We apply that model-based discipline to Tekla packages today: coordinated models, consistent numbering and quantities that reconcile with the drawings at every revision.

On QatarEnergy-operated and affiliated projects, the operator's engineering standards and the project specification govern. We detail to them as issued, alongside the AISC or Eurocode design basis your engineer has specified, and we do not claim operator approval; vendor qualification stays with the EPC and the fabricator.

Scope & Deliverables

Typical Qatar packages

  • Pipe Racks and Pipe Bridges for LNG and Gas-Processing Trains
  • Equipment Platforms, Access Steel and Maintenance Structures
  • Shelters, Compressor Houses and Industrial Buildings
  • Pipe Support and Cable Tray Support Steel
  • Brownfield Tie-in and Modification Steel on Operating Plants
  • Foundations and Pedestals (RCC Drawings and BBS)

Deliverables

  • Tekla Structures Detailing Model
  • GA, Erection, Assembly and Single-Part Drawings
  • Anchor Bolt Plans and Embed Details
  • MTO and Bolt Lists Reconciled to Each Revision
  • Drawing Registers, Transmittals and Revision Records
  • NC / DSTV Files and IFC Exports Where Contracted

Standards & Specifications

QatarEnergy engineering standards, EPC procedures and the project specification govern where they apply; we detail to them as supplied and flag conflicts with the general codes for the engineer to resolve. Working to a standard is not a claim of approval or certification.

The scope of work records the applicable standards and editions for each package. A reference to a standard does not imply design verification or certification.

How standards are applied
  • Client / EPC / asset owner

    Project specifications

    Client, EPC and Owner Standards and Project Specifications

  • AISC

    AISC 303

    Code of Standard Practice for Steel Buildings and Bridges

  • AISC

    AISC 360

    Specification for Structural Steel Buildings

  • CEN

    Eurocodes

    Eurocodes with the Applicable National Annex

  • AWS

    AWS D1.1

    Structural Welding Code — Steel

  • BSI

    BS 8666

    Scheduling, Dimensioning, Cutting and Bending of Steel Reinforcement

From Lahore, on your schedule

Working Your Hours

Lahore is UTC+5: one hour ahead of the UAE and two ahead of Saudi Arabia and Qatar, so we work your full business day.

  • UTC+5LahoreOur office (no daylight saving)
  • UTC+4UAE1 hour behind Lahore
  • UTC+3Saudi Arabia2 hours behind Lahore
  • UTC+3Qatar2 hours behind Lahore

How a Package Runs

Inputs, model, checks, drawings and revisions, with information gaps raised before work proceeds.

  1. 01

    Inputs

    Design drawings, operator standards, project specifications and vendor data reviewed and logged.

  2. 02

    Model

    Tekla model set up to the project numbering, area codes and phasing.

  3. 03

    Checks

    Model, drawings and MTO checked against the design and the query log.

  4. 04

    Drawings

    Fabrication and erection documents issued through your document control system.

  5. 05

    Revisions

    Comments and design changes clouded, re-issued and tracked to closure.

Do you have an office in Qatar?

No. We work remotely from our office in Lahore, two hours ahead of Qatar. Models, drawings and comments move through your document control system or an agreed transfer method, and calls are held in Qatar working hours.

Can you work to QatarEnergy standards and project specifications?

Yes. We detail to the operator standards, EPC procedures and project specifications issued with each package, and record which document governs each requirement. We do not claim QatarEnergy approval; vendor qualification remains with the EPC and the fabricator.

Can you produce material take-offs for procurement?

Yes. Take-offs come from the detailing model and are tied to the drawing revision they were taken from, with units, inclusions and exclusions stated, so procurement quantities can be reconciled as the design develops.

How quickly will we receive a quote?

We reply to quote requests within 24 hours (GCC working day). Send drawings or a scope summary with the deliverables, standards and target dates you have; where inputs are incomplete we list the assumptions we priced and the questions to close.

Can we start with a small trial package?

Yes. Our pilot is one assembly or a 5–10 t package, at a fixed price, delivered in 5 working days from receipt of complete inputs. It lets you check our model, drawing standard and checking on your own project before committing a larger package. NDA on request.

Send Your Drawings

We reply within 24 hours (GCC working day). A scope summary is enough to start; NDA on request.

Technical services involvedOptional, tick any that apply

Describe the structures, the design inputs you have, the deliverables you need and your target schedule.

Technical details (optional)

For example Tekla Structures 2024, AutoCAD, native or IFC exchange.

For example 40 shop drawings or BBS for 12 foundations, plus the codes and standards that apply.

One file up to 8 MB (.pdf, .dwg, .dxf, .zip, .png, .jpg, .jpeg). Please do not attach confidential drawings here; project files are exchanged after first contact, under an NDA if required.

Only name, organisation, work email, service and scope summary are required. Your details are used to respond to this enquiry and prepare any quotation; see our Privacy Policy. Please do not send confidential drawings until an NDA or approved file exchange is agreed.

For Clients Only

Our project drawings are confidential. Full views, downloads and copies are available to clients only. Contact us to discuss samples relevant to your scope.

Contact Us